Product description ※Please note that product information is not in full comprehensive meaning because of the machine translation.
Product Description In March 2022, the first "Taigei" was commissioned as a successor to the "Soryu-type" submarine.
It looks similar to the "Soryu-type" submarine, but it is equipped with a lithium storage battery, which enables higher capacity and Oide power.
The fourth "Raigei" was launched in October 2023 and is scheduled to be commissioned in March 2025.
1/700 Scale Plastic Model
The parts are divided for easy assembly and painting while the differences with the Soryu-type are reproduced such as the expanded hull upper part and sail base part.
Ship number and ship name of SS-516 Laigei and SS-517 (scheduled to be named in the fall of 2024) are attached with decals
Full hull model
2 ships
[Product Details]
Completed Size : Total Length Approx. 119 mm