Tateyama Erosion Control Tramway Tateyama Erosion Control Torokko Day

※Please note that product information is not in full comprehensive meaning because of the machine translation.
Japanese title: その他DVD 立山砂防軌道 立山砂防トロッコの一日
Out of stock
Item number: 151100385
Released date: 21 Feb 2017
Maker: Anneck
Media: DVD

Product description ※Please note that product information is not in full comprehensive meaning because of the machine translation.

[Recording Time]
170 minutes
[Screen Size]
Wide
[List of Contents]
Introduction and explanation of Tateyama Sand Control Tramway / Introduction of one day of Tateyama Sand Control Torokko / Introduction of forward view from Senjugahara to Mizutani branch office, running scene, working people, Each Contact Office and sand control dam / Introduction of sand control dam by aerial photography (drone) / Bridge construction of Kamiyama Bridge / Ohtani Type
[Number]
1
[Video Comments]
This article takes up the Tateyama Sand Control Torokko, which was invented in 1926 and opened in 1931. It contains an explanation of Tateyama Sand Control Tramway and a day of Torokko, including a transportation system for large-scale construction and 18-step continuous switchback which is unprecedented in the world.
[Name of Manufacture]
Date