Product description ※Please note that product information is not in full comprehensive meaning because of the machine translation.
[Recording Time]
133 minutes
[Screen Size]
Wide
[Image Special Contents]
Introduction of cars and exchange of trains at Nechi station (recorded in the main part)
[Contents List]
Observation screen (Itoigawa - Minami-Otari / Minami-Otari - Itoigawa) / Calling of the driver, in-car broadcasting
[Number of trains]
1
[Image Comments]
The Oito Line connecting Itoigawa station and Minami-Otari station. This section introduces the non-electrified section mainly with observation images. Trains are exchanged at Nechi station, the warm and deep diesel sound of Kiha 52 Series that gently runs along the scenic Himekawa, and the atmosphere of a down train.